Preventative Maintenance
Facility Layout and Physical Environment
•
3m 30s
Your equipment must be inspected by a biomedical engineer / preventative maintenance. Make sure you have a written agreement (contract) and record the frequency of visits. Make sure you obtain a complete equipment list from the vendor and service report on each piece of equipment.
Up Next in Facility Layout and Physical Environment
-
Operating Room Flooring
You want to inspect the operating room flooring at periodic intervals for wear and tear. You can be cited if the flooring shows signs of deterioration, cracks and tears in the flooring.
-
Nurse Call System Code Blue Button
Nurse call system is an immediate alert response device. It provides an audible noise to the exact location of the patient.
-
Multidose Vial Storage Area
A multidose vial of medication must be opened in a non patient care area. You are required to document the day or opening or expiration (this will be 28 days from the opening date, or manufacturer's expiration date, whichever is sooner). Draw up the medication from the multidose vial to include...